Granite
Halmar, the general contractor during construction
of New York City Transit Authority's bus depot,
was faced with a challenge while arranging for office
and conference space for their site engineers.
Due to the constrained working conditions, placement
of the mobile offices they needed was restricted
to an area running approximately 16 feet around
the construction-site's perimiter.
ModSpace provided the solution by stacking multiple
12' x 60' construction offices on a scaffolding
system strong enough to safely support their weight.
No easy task, considering the units had to be stacked
on top of each otherrequiring a scaffolding
system measuring over 12 feet in the air.
This unique application allowed Granite Halmar to
work within the site's limitations, while successfully
gaining them the necessary office and conference space
they needed during construction of the bus depot.
|